Maps and Reports
Study Area
The general study area extends along Lockhaven Drive to River Road to the west. Along Salem Parkway, the general study area will extend south to the intersection with Verda Lane and Hyacinth Street and along Portland Road, it will extend southerly to Ward Drive. Hayesville Drive roughly defines the southerly boundary east to Cordon Road. The boundary follows Cordon Road north to about one property north of Hazelgreen Road, where it turns west, eventually following Lakeside Drive. Between OR 99E and I-5, Labish Ditch defines the northern boundary of the study area. Labish Ditch is followed west of I-5 to approximately McLeod Lane where the boundary follows that roadway south to near Lockhaven Drive.
Presentations
Open House #1 Introduction Presentation
956kb PDF | added 8/14/2008
Preliminary Alternatives Presentation
936kb PDF | added 8/18/2008
Maps
To view the draft drawings for the 15 alternatives, please click here!
Study Area
6,354kb PDF | added 8/07/2008
Interchange Spacing
160kb PDF | added 8/07/2008
Existing Conditions Traffic Analysis
232kb PDF | added 8/14/2008
2031 Future Conditions Analysis
237kb PDF | added 8/07/2008
Comprehensive Plan Map
425kb PDF | added 8/14/2008
Potential Wetlands
412kb PDF | added 8/14/2008
Reports
Data Collection Methods
326kb PDF | added 9/2/2008
Existing Conditions Report
1.7mb PDF | added 8/14/2008
Existing Conditions Appendix
37kb PDF | added 8/14/2008
Crash Analysis
767kb PDF | added 9/2/2008
2031 Future Conditions Summary
138kb PDF | added 9/2/2008
Draft Future Conditions Report
762kb PDF | added 9/22/2008
Appendix Future Conditions Report
1 mb PDF | added 9/22/2008
Interview Summary Report
146kb PDF | added 6/23/2008
Interchange Area Management Plan Guidelines
2.4mb PDF | added 7/1/2008
Tables:
Traffic Analysis
524kb PDF | added 7/25/2008
Traffic Analysis Results - Intersections Table 1
127kb PDF | added 7/25/2008
67kb PDF | added 7/25/2008